Themabewertung:
  • 0 Bewertung(en) - 0 im Durchschnitt
  • 1
  • 2
  • 3
  • 4
  • 5
MRC - Half-size build report (2011)
#20
I have the upper stairwell completed and installed (no photo yet), but I may have to stop work on the model -- *any* model -- for a couple of days. The weather has turned warm (almost 30 C right now and expected to be 34 C tomorrow and Wednesday) and very arid; the humidty is so low that the glue dries faster than I can apply it! :-/

Maybe in the evenings ...
Zitieren


Nachrichten in diesem Thema
RE: MRC - Half-size build report (2011) - von Mike Hungerford - 02.05.2011, 22:05

Gehe zu:


Benutzer, die gerade dieses Thema anschauen: 1 Gast/Gäste