Antwort schreiben 
MRC - Anleitung Hülle / instruction hull
Verfasser Nachricht
Mike Hungerford Offline
Taube

Beiträge: 71
Registriert seit: Apr 2008
Beitrag: #101
RE: Megaton Recycling Crawler (MRC) -----> Baubericht Hülle / building report hull
Markus, I have questions on a few of the parts.

Hull-009 (4x upper reinforcements) - where do they go?

Hull-010 (2x lower reinforcements) - where do they go?

Det-34 & 35, and Det-38 through Det-43 - all lights; where do they go?

TW-03c (optional top exhaust inside ring) - it goes inside the top of the tower to inset the grille a bit, yes?

On page 5 of the Tower parts are eight little orange things, obviously meant to be doubled, with no part number and not shown in your build sequence that I can see. Where do they go?

Mike Hungerford
http://www.chthulhu.com/models.html
27.04.2011 20:03
Alle Beiträge dieses Benutzers finden Diese Nachricht in einer Antwort zitieren
Niceyard Online
Administrator

Beiträge: 4.585
Registriert seit: Nov 2007
Beitrag: #102
RE: Megaton Recycling Crawler (MRC) -----> Baubericht Hülle / building report hull
The reinforcement parts 009 and 010 are to link the inner reinforcement ribs of the MRC.
You can see the left half of the parts on the picture. They are used on both sides.
Part 009 links the top ribs with the side ribs.
Part 010 links the side ribs with the botom rim.

   

The big lights are left to Your own usage. They can be attached to any thinkable part for illumination of the landscape around the MRC. They are optional and have no defined place. I left them out.

Yes, the tower inside ring sets the grill a bit down inside the tower.
You have to cut out the grill of the tower top and throw it away using the separate grill with the light grey circles instead.

The 8 little parts are to be put at the tower top (tower sheet 4) onto the lines of same shape.
These are the hatches of the rain protector shields.

Bemalte Modelle 2013: 39 / 2014: 23 / 2015: 58 / 2016: 44 / 2017: 104 / 2018: bisher 1
(Dieser Beitrag wurde zuletzt bearbeitet: 30.04.2011 02:49 von Niceyard.)
30.04.2011 02:36
Webseite des Benutzers besuchen Alle Beiträge dieses Benutzers finden Diese Nachricht in einer Antwort zitieren
Mike Hungerford Offline
Taube

Beiträge: 71
Registriert seit: Apr 2008
Beitrag: #103
RE: Megaton Recycling Crawler (MRC) -----> Baubericht Hülle / building report hull
(30.04.2011 02:36)Niceyard schrieb:  The reinforcement parts 009 and 010 are to link the inner reinforcement ribs of the MRC.
You can see the left half of the parts on the picture. They are used on both sides.
Part 009 links the top ribs with the side ribs.
Part 010 links the side ribs with the botom rim.
I don't need them, then: the top is one piece.
(30.04.2011 02:36)Niceyard schrieb:  The big lights are left to Your own usage. They can be attached to any thinkable part for illumination of the landscape around the MRC. They are optional and have no defined place. I left them out.
Good to know; thank you.
(30.04.2011 02:36)Niceyard schrieb:  Yes, the tower inside ring sets the grill a bit down inside the tower.
You have to cut out the grill of the tower top and throw it away using the separate grill with the light grey circles instead.
Got it.
(30.04.2011 02:36)Niceyard schrieb:  The 8 little parts are to be put at the tower top (tower sheet 4) onto the lines of same shape.
These are the hatches of the rain protector shields.
Ah, now I see; thank you again. :-)

Mike Hungerford
http://www.chthulhu.com/models.html
30.04.2011 03:07
Alle Beiträge dieses Benutzers finden Diese Nachricht in einer Antwort zitieren
Antwort schreiben 


Gehe zu:


Benutzer, die gerade dieses Thema anschauen: 1 Gast/Gäste